Process Safety Management was initiated by OSHA in 1992 as a way to respond with government oversight of industries using Highly Hazardous Chemicals (HHCs).  Events prior to that date, involving the infrequent release of HHCs had sometimes resulted in catastrophic damage, injuries, and even death.  Clearly, unchecked processes added to a volatile situation sometimes make things worse; much worse.

In September 1994, OSHA issued Instruction CPL 02-02-045, Process Safety Management of Highly Hazardous Chemicals-Compliance Guidelines and Enforcement Procedures.  This instruction ceded that the Program Quality Verification (PQV) inspections required great resources and limited the number of inspections that could be accomplished.  This was a program that didn’t have the effect that was desired.

Even with OSHA’s good intent, catastrophic incidents were still happening, especially in the petroleum industry:

  • 2004: Gallup, NM, 6 injured
  • 2005: Texas City, TX, 15 killed, 170 injured
  • 2005: Bakersfield, CA, 1 killed
  • 2007: Dumas, TX, HHC release and fire
  • 2008: Big Spring, TX, LPG release and explosion

 In 2007, OSHA initiated the Refinery National Emphasis Program (NEP) to zero in on the factors that most affected process safety in refineries.  By all standards the program was successful.  There were certainly still incidents in the refinery industry, but the nature and the resulting damage were greatly decreased.  Still more work and inspections would need to be done.

Due to the success of the NEP in the refinery industry, OSHA initiated a pilot program in the other facilities that dealt with HHCs.  This pilot program became official, nationwide in 2011 through OSHA Instruction CPL 03-00-14, PSM Covered Chemical Facilities National Emphasis Program; CHEMNEP for short.

The refinery NEP and the CHEM NEP are two different programs, but each involves a closer look and scrutiny of 14 major elements:

  1. Employee Participation
  2. Process Safety Information
  3. Process Hazard Analysis
  4. Operating Procedures
  5. Training
  6. Contractors
  7. Pre-Start Up Review
  8. Mechanical Integrity
  9. Hot Work Permit
  10. Management of Change
  11. Incident Investigation
  12. Emergency Planning and Response
  13. Compliance Audits
  14. Trade Secrets 

In the following blog posts I will go in to more detail in all of the 14 elements.  If you have experience with NEP and/or CHEM NEP let me know what you think of your PSM program and how you've improved your safety and process of HHC.

 

Add new comment

Warning
Please refrain from adding URLs to unrelated or commercial websites. This site is moderated and comments with inappropriate links are rejected. Thank you for your understanding.
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
10 + 4 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.